Even when it comes to delivery and installation, the sybkon balcony system guarantees maximum efficiency. Not only are the modules themselves carefully engineered, but the on-site installation process is equally well thought out. As a result, our uniquely fast installation requires only two steps.

STEP 1

Once the scaffolding is in place, the substructure consisting of sybkon profile columns and wall profiles is mounted in line with the chosen balcony type and configuration. In parallel, the balcony elements are produced in our plant.

Video anschauen

STEP 2

The individual balconies are delivered ready for installation and mounted onto the wall brackets – including the selected floor panels and preferred railing options. This allows on-site installation to be completed in the shortest possible time, keeping disruption for residents to an absolute minimum.

Video anschauen

SYBKON DUST PROTECTION WALL

The construction site feel-good effect

We don't just have the balcony extension in mind, but also efficient and careful installation. This also means that we minimise the inconvenience to residents as much as possible. With the robust sybkon dust protection wall, living spaces remain free of dust and dirt.

We would be happy to explain the installation steps to you in a personal meeting: